Highlights of Major Projects

Erection & Commissioning:

  • SWCC Jubail Plant.
  • Royal Commission- Jubail P/P.
  • Electricity Corporation Al Jouf P/P.
  • Sceco- Najran Power Plant
  • Arabian Pipe coating- Jubail (DG)

Operation & Maintenance:

  • KKMC- Hafar Al Batin :1983 to 1994
  • SCECO – Najran PP :1987
  • E.C – Al Jouf PP :1987
  • SEC East Power Plants: 1999 to 2009
  • SEC Central Power Plants: 2007 to 2012 & 2014 to 2018
  • Saudi Aramco Riyadh Refinery – GT units: 2008 to 2019
  • Relocation of TM2500 units 2018-2021
  • Maintenance of TM2500 units 2018-2021

Maintenance & Service:

  • Rehabilitation & commissioning of GT unit SWCC-Jubail. (Fiat TG20B)
  • Rebuild & Commissioning of GT (GE Frame 5) Radwa Food Co.- Jeddah.
  • Overhauling of Gas Turbines- Over 120 times (GE, Westinghouse, MHI, ABB & , SIEMENS & Fiat)
  • Major Generator Inspections – over 30
  • HGPI of Gas Turbine Units- Over 210
  • Relocation of Gas Turbines- 8 units

Repair & Refurbishment of GT Components:

  • Repair of Gas Turbine Blades/Buckets Over – 400 Sets (GE, W/H, MHI, ABB)
  • Repair of Gas Turbine Nozzles / Vanes – Over 300 Sets (GE, W/H, MHI, ABB)
  • Overhauling of Gas Turbine Rotors – Over 30 Nos. (GE, Fiat, MHI, ABB)